Mo-Mex
Manufacturing and assembling products in
Mexico can produce substantial cost savings over performing the same
operations in the United States, principally due to the much lower cost
of Mexican labor. The current fully loaded base hourly rate for a
productive labor hour in one of our plants is $1.34
|
 |